Your Progress 0%

The Planning Act 2026 and the End of the RMA

1. What Has Changed, and When

For more than 30 years, the Resource Management Act 1991 (the RMA) has decided what you can build on your land, how councils write their plans, and who gets a say on your neighbour's extension. In September 2026 it began to be replaced by two new laws: the Planning Act, which deals with how land is used and developed, and the Natural Environment Act, which deals with the use of natural resources such as water, air and soil and with protecting the environment. The switch does not happen overnight. Most of the change reaches homeowners and farmers from around 2030.

Advertisement
Key Point: Both Acts were passed into law in September 2026, and a transition began in October 2026. During the transition, which the Government expects to last until around 2030, the RMA still applies: existing district and regional plans stay in force, you still apply to your council for resource consent, and existing consents keep working. The new system arrives in stages, with standardised national rules and zones meant to let more everyday home projects go ahead without consent. Granny flat exemptions that took effect on 15 January 2026 are separate and continue.

Two Acts with different jobs

ActWhat it coversExample
Planning ActLand use and developmentBuilding height, site coverage, subdivision, zoning
Natural Environment ActNatural resources and environmental limitsWater takes, discharges, earthworks near waterways

The timeline

The Government's planning site, planning.govt.nz, sets out the key milestones. These are targets, and the dates may move.

WhenWhat happens
September 2026The Planning Act and Natural Environment Act pass into law; some consents are automatically extended
October 2026The transition and transitional consenting begin, with targeted changes to the RMA
Mid 2027A new Planning Tribunal is set up
By September 2027The first national policy direction is issued
By June 2028National standards for standardised plan provisions are finalised; draft regional spatial plans are notified
By March 2029Regional spatial plans are decided
By December 2029Councils notify their proposed land use and natural environment plans; the RMA is then repealed on a specified transition date set by Order in Council
2030Proposed land use and natural environment plans have legal effect

2. Building, Renovating and Subdividing

During the transition

If you want to extend your house, build a garage or subdivide in 2026 to 2029, the process looks much as it does today. You check your district plan, and if a resource consent is needed you apply to your council, which decides it under the RMA. A few things have already changed. planning.govt.nz's key milestones page lists these transitional consenting amendments to the RMA as starting in October 2026:

  • For a district land use consent, the council can no longer consider certain kinds of effects, narrowing what it can weigh against your project.
  • Two new or changed alternative permitted pathways can let some activities go ahead without consent.
  • The special circumstances test for public notification has been removed, so notification turns on the effects of the proposal.
  • New procedural principles guide how councils make decisions.

Once the new system is running

The bigger changes arrive with the new national standards and the plans councils write under the new Acts. According to planning.govt.nz:

  • Standardised zones: councils will mostly use national zones, overlays, definitions and rules for building height, site coverage, noise, vibration and sunlight, so similar plans can be used in different districts.
  • More done without consent: low-impact projects that mainly affect your own property, such as the layout of your house, balconies or private outdoor space, can go ahead if they meet the rules.
  • Neighbours still count: effects such as noise, shading, flood risk and infrastructure capacity can still be managed where the rules apply.
  • Subdivision: it will have a more permissive starting point, though flooding and other natural hazards still have to be managed and roads, pipes and other services must be available or planned.
  • Narrower notification: people may be notified where they are materially affected and the threshold for adverse effects is met.
  • Relief: if council rules protecting heritage, landscapes, sites of significance to Māori or biodiversity significantly affect the reasonable use of your land, you may be eligible for relief, such as money, lower rates or fees, extra development rights or land swaps.
  • Planning Tribunal: some disputes, such as about information requests, notification decisions, consent conditions and relief, can go to a new Planning Tribunal.
Building consent is separate. The Planning Act is about resource consent. Whether you need a building consent is decided under the Building Act 2004, which these reforms do not replace.

3. Granny Flats, and a Worked Example

Many people heard about the planning reforms because of granny flats. The granny flat changes are separate from the Planning Act, and they are already in force.

The granny flat exemptions

Since 15 January 2026, two exemptions work together. Under the Building Act, a new standalone, single-storey, self-contained dwelling of up to 70 square metres can be built without a building consent, if it is designed and built by licensed building professionals and every other condition is met. On the planning side, a national environmental standard made under the RMA lets a qualifying granny flat go ahead without resource consent in many places. Building Performance says some projects qualify for both exemptions, while others still need a building consent, a resource consent or both, depending on the site. These rules continue through the transition.

What you still have to do

  • Apply for and receive a project information memorandum (PIM) from your council before work starts. The council has 10 working days to issue it once it has a complete application.
  • Use licensed building practitioners, registered architects or chartered professional engineers to design it, and licensed building professionals to build it.
  • Finish within two years of the PIM, or apply for an extension.
  • Notify the council, with all the required documents, within 20 working days of finishing, and pay any development contribution in the same period.

Worked example

Sione and Mele want a 60 square metre standalone granny flat behind their house. Their site has no unmitigated natural hazards and meets the local planning rules.

Floor area: 60 square metres, under the 70 square metre limit
Complete PIM application lodged: Wednesday 3 March 2027
PIM due within 10 working days: by Wednesday 17 March 2027
Build must be finished within two years of the PIM, by March 2029
Build finished: Friday 3 September 2027
Notify council within 20 working days: by Friday 1 October 2027

Their project does not depend on the Planning Act at all. If the flat had been two storeys, or 80 square metres, it would need a building consent and probably a resource consent under their current district plan, and the application would go through the RMA's transitional consenting process. Use the Granny Flat Consent-Free Checker to test a design against the conditions, and the Granny Flat Cost Calculator to price it.

If you already hold a consent

Existing resource consents carry on, and will become planning consents, natural resource permits or both. Many consents that would otherwise expire between the Acts passing and two years after the specified transition date are extended to two years after that date. That date is not yet set. If, for example, it were 1 July 2030, a consent due to expire in March 2028 would run until 1 July 2032.

4. Farmers, and What Stays the Same for Now

For farmers and growers

The Natural Environment Act includes a goal of enabling the use and development of natural resources, including for producing food and fibre. Over time, national policy direction and national standards are meant to give more consistent rules for land use, discharges, water takes, vegetation clearance and earthworks.

  • Environmental limits will set boundaries for effects on freshwater, coastal water, air, land, soil and indigenous biodiversity. They apply to areas such as catchments, not individual properties.
  • Lower-risk activities may face fewer requirements where limits and rules allow, while small effects that add up can still be managed.
  • Freshwater farm plans stay central, and during the transition they are expected to be introduced through existing RMA provisions.
  • Water allocation stays on today's first-in, first-served basis, with priority for existing users seeking replacement permits. Market-based allocation is not being introduced at this stage.
  • Registration of permitted activities can only be required where national standards require or allow it.
  • Existing consents are extended as described above, but water-related consents are not extended beyond the 35-year maximum, and consents for wastewater networks are not extended.

The Acts make specific arrangements for Waikato Regional Council's Plan Change 1 and Horizons' Plan Change 2 to the One Plan, which continue during the transition.

What stays the same for now

Today, during the transitionChanges later
Your current district and regional plans applyNew land use and natural environment plans, from around 2030
Resource consents are decided by your council under the RMAPlanning consents and natural resource permits under the new Acts
Councils enforce the rules as nowSome enforcement changes as the system rolls out
Building consents under the Building ActNot changed by these reforms
Granny flat exemptions in force since 15 January 2026Continue

What to do now

1. Check your current district plan before any project; it still applies
2. Ask your council whether a transitional change helps your application
3. Note the expiry dates of any consents you hold, and whether they are extended
4. Watch for consultation on national direction and your region's spatial plan
5. Keep an eye on planning.govt.nz, which adds guidance as the system is introduced

Final word: the RMA is on its way out, but slowly. For the next few years, plan your project under the rules you can read today, use the granny flat exemptions if they fit, and take part in the consultations that will shape your area's new plan. Parliament can amend any law, so check the current position before you commit money. This is general information, not legal or planning advice.

Test Your Knowledge

Quiz on the Planning Act 2026 and the End of the RMA (10 Questions)

1. Which two Acts replace the RMA?
The Building Act and the Local Government Act
The Housing Act and the Water Services Act
The Planning Act and the Natural Environment Act
The Spatial Planning Act and the Climate Act
2. In 2027, a resource consent application for a house extension is decided under:
The RMA, as amended for the transition
The new Planning Tribunal only
No rules at all until 2030
The Building Act
3. When does the RMA itself get repealed?
On the day the new Acts passed
On 1 January 2027
It is never repealed
On a transition date set by Order in Council
4. The granny flat building consent exemption allows a standalone single-storey dwelling of up to:
30 square metres
70 square metres
100 square metres
Any size
5. Before building an exempt granny flat you must get:
A code compliance certificate
A Planning Tribunal ruling
A project information memorandum (PIM)
A land use consent from the region
6. Under the new system, which effect can still be managed through the rules?
Shading of a neighbour's property
The layout of rooms inside your own house
The size of your private balcony
The colour of your front door
7. What happens to most existing resource consents?
They are cancelled
They must be applied for again in 2027
They lapse when the RMA is repealed
They continue, and many are extended
8. Environmental limits under the Natural Environment Act apply to:
Each individual farm
Areas such as catchments
Only urban areas
Only the coastline
9. During the transition, freshwater is allocated:
On a first-in, first-served basis, as now
By auction to the highest bidder
Equally to every landowner
Only to new users
10. When is the full new planning system expected to be in place?
October 2026
2027
Around 2030
2040

Frequently Asked Questions

Has the RMA been replaced?

The Planning Act and the Natural Environment Act were passed into law in September 2026, but the Resource Management Act 1991 has not been repealed yet. A transition began in October 2026, during which existing RMA plans, consents and processes continue with some amendments. The RMA is repealed on a specified transition date set by Order in Council once councils have notified their new plans, which the Government's timeline expects by December 2029.

Do I still need a resource consent to build?

During the transition you apply to your council under the RMA as before, against your current district plan. Some changes already apply, including a narrower range of effects a council can consider for district land use consents. The bigger change, more projects allowed without consent under standardised national zones, comes with the new plans from around 2030.

Does the Planning Act change the granny flat rules?

Not at present. The granny flat exemptions came into force on 15 January 2026, under the Building Act and a national environmental standard made under the RMA. They allow a new standalone single-storey dwelling of up to 70 square metres without a building consent, and in many places without a resource consent, if every condition is met. They continue through the transition.

What happens to my existing resource consent?

It continues and will become a planning consent, a natural resource permit or both under the new system. Many consents that would otherwise expire between the Acts passing and two years after the specified transition date are extended to two years after that date, but water-related consents are not extended beyond 35 years and wastewater network consents are not extended.

What changes for farmers?

Over time, national standards and natural environment plans will set clearer, more consistent rules, with environmental limits set for catchments rather than individual farms. For now, existing consents, freshwater farm plans under the RMA and the first-in, first-served allocation of water continue.

Related guides and calculators