Penlink Toll Calculator NZ
O Mahurangi Penlink is the new 7 km toll road linking Whangaparaoa Road on the Whangaparaoa Peninsula to State Highway 1 at Redvale. NZTA forecasts it to be finished at the end of 2029; check NZTA for the opening date. Cars pay $3.00 a trip at peak times and $2.00 off-peak for the full length, less for the shorter East Coast Road section, and heavy vehicles pay double. Enter how many trips you make each week at peak and off-peak times, and this calculator shows what the tolls add up to each week, month and year, and how much you would save by shifting trips outside the peak.
Your Trips
Your Vehicle and Route
How it works
The weekly toll is your peak trips times the peak toll, plus your off-peak trips times the off-peak toll. The yearly figure is the weekly toll times 52, and the monthly figure is the yearly figure divided by 12, so it is an average across long and short months. The saving from shifting trips is the difference between the peak and off-peak toll for every peak trip, over a year. Holidays and weeks you do not drive are not taken off, so trim your trip count if you want a closer figure.
| Vehicle and route | Peak, per trip | Off-peak, per trip |
|---|---|---|
| Light vehicle, full length | $3.00 | $2.00 |
| Light vehicle, East Coast Road to Whangaparaoa Road | $2.00 | $1.00 |
| Heavy vehicle, full length | $6.00 | $4.00 |
| Heavy vehicle, East Coast Road to Whangaparaoa Road | $4.00 | $2.00 |
Peak is 6am to 9am and 4pm to 7pm, Monday to Friday. Off-peak is every other hour, plus all of Saturday, Sunday and public holidays. Heavy vehicles pay double the light vehicle toll; the heavy vehicle figure for the East Coast Road section is that doubling rule applied, as NZTA's summary gives only the light vehicle price for the section. Buses and people on bikes, using the shared path, are not tolled.
SH1 to East Coast Road only. A trip between State Highway 1 and East Coast Road passes one toll point, at the SH1 interchange. NZTA's FAQ does not give a price for that trip; NZTA's earlier proposal tables showed $1.00 for a light vehicle, but that is not confirmed as the final toll, so the calculator does not include it. Check NZTA's Penlink page or the roadside signs before relying on a figure for it.
Worked example
The default inputs are a weekday commuter in a car: 10 peak trips a week, out in the morning and home in the evening, plus 4 off-peak trips at the weekend, on the full length of the road. That is 10 x $3.00 = $30.00 plus 4 x $2.00 = $8.00, so $38.00 a week. Over 52 weeks it comes to $1,976.00 a year, which averages $164.67 a month. If all 14 trips could be made off-peak the toll would be 14 x $2.00 = $28.00 a week, which is $10.00 a week or $520.00 a year less.
Sources
- NZ Transport Agency, FAQs on tolling Penlink: the toll prices, peak hours and the heavy vehicle rule.
- NZ Transport Agency, Penlink tolling: the decision to toll and the Order in Council to be put in place before the road opens.
- NZ Transport Agency, Toll payment notices: the five working day rule and the administration fee.
NZTA's pages could not be read by our automated source checks on the day this page was built, so the prices were taken from NZTA's published text as indexed and reported, and are checked weekly. The tolls are set by an Order in Council made before tolling starts; if the final prices differ, the calculator will be updated.
Related calculators
- Commute Cost Calculator: the full cost of getting to work.
- Fuel Cost Calculator: what the same trips cost in fuel.
- Petrol vs Public Transport Calculator: compare driving with the bus.
- Fines, Tolls and Parking Tickets: what you actually owe and when.